IMG_5886.jpeg

parasite

The project

Teams of four were assigned random spots around Cal Poly SLO’s architecture building, where we then had to design and build a structure that could temporarily be installed for a week in this spot, while adhering to all safety codes and without damaging the building. I worked alongside Krissy Velardi, Elisabeth Frizzell, and Montzerrat Morales.

INSTALL


 
 
 
 

drawings


details


PRODUCTION